ADI115-30 Netherlands

NATURAL GAS COMPRESSOR ADI115-30 LOCATION: NETHERLANDSFLUID: Natural gasPOWER INSTALLED: 60 hp INLET PRESSURE: 44 psi(g)WORKING PRESSURE: Up to 363 psi(g)FLOW RATE: 0<93<187 SCFMAMBIENT TEMPERATURE: -4/+104 °F Double stage reciprocating compressor installed in the Netherlands. Designed for classified Atex Zone 2 for outdoor installation. It is water cooled and completed with bleed valve for depressurization to vent, electro-pneumatic proportional bypass valve and controlled… Continue reading ADI115-30 Netherlands

UVG132/BVG30-Lithuania

BIOGAS COMPRESSOR / CO2 RECOVERY UVG132/ BVG30 UVG 132   LOCATION: LITHUANIAFLUID: BiogasPOWER INSTALLED: 220 hpINLET PRESSURE: 1,4 psi(g)WORKING PRESSURE: Up to 174 psi(g)FLOW RATE: 0<243<486 SCFMAMBIENT TEMPERATURE: +37,4/+104 °F BVG 30 LOCATION: LITHUANIAFLUID: CO2POWER INSTALLED: 60 hpINLET PRESSURE: 7,6 psi(g)WORKING PRESSURE: Up to 58 psi(g)FLOW RATE: 0<93<187 SCFMAMBIENT TEMPERATURE: +37,4/+104 °F Two screw compressors… Continue reading UVG132/BVG30-Lithuania

UVG315/ADI115-France

BIOGAS COMPRESSOR / RNG GRID INJECTION UVG315/ ADI115 UVG 315   LOCATION: FRANCEFLUID: BiogasPOWER INSTALLED: 550 hpINLET PRESSURE: 2,2 psi(g)WORKING PRESSURE: Up to 232 psi(g)FLOW RATE: 0<558<1117 SCFMAMBIENT TEMPERATURE: 14/+104 °F ADI 115 LOCATION: FRANCEFLUID: BiomethanePOWER INSTALLED: 100 hpINLET PRESSURE: 116<232 psi(g)WORKING PRESSURE: Up to 1015,3 psi(g)FLOW RATE: 0<271<358 SCFMAMBIENT TEMPERATURE: 14/+104 °F Two compressors… Continue reading UVG315/ADI115-France

BVG132/BVG315- France

BIOGAS COMPRESSORS BVG132/ BVG315 3x UVG 132   LOCATION: FRANCEFLUID: BiogasPOWER INSTALLED: 3x 220 hpINLET PRESSURE: 4,1 psi(g)WORKING PRESSURE: Up to 217,6 psi(g)FLOW RATE: 0<252<504 SCFMAMBIENT TEMPERATURE: -4/+104 °F 2x UVG 315 LOCATION: FRANCEFLUID: BiogasPOWER INSTALLED: 2x 550 hpINLET PRESSURE: 4,1 psi(g)WORKING PRESSURE: Up to 217,6 psi(g)FLOW RATE: 0<623<1246 SCFMAMBIENT TEMPERATURE: -4/+104 °F A plant with… Continue reading BVG132/BVG315- France

BVG45-Poland

BIOMETHANE COMPRESSOR BVG45 LOCATION: POLANDFLUID: BiogasPOWER INSTALLED: 2x 75 hpINLET PRESSURE: 0,7-2,9 psi(g)WORKING PRESSURE: Up to 65,3 psi(g)FLOW RATE: 0<125<249 SCFMAMBIENT TEMPERATURE: +37,4/+104 °F Two screw compressors for biomethane located in Poland. Designed for classified area Atex Zone 2 for indoor installation. They are air cooled and equipped with medium filtration, bleed valve for depressurization… Continue reading BVG45-Poland

ADI115-30-Poland

BIOMETHANE BOOSTER ADI115-30 LOCATION: PolandFLUID: Natural gasPOWER INSTALLED: 60 hpINLET PRESSURE: 261 psi(g)WORKING PRESSURE: Up to 326 psi(g)FLOW RATE:  0<1300<1620 SCFMAMBIENT TEMPERATURE: -4/+104 °F Single-stage reciprocating compressor for natural gas installed in Poland. Designed for classified Atex Zone 2. It is air cooled and completed with fine filtration and electropneumatic by-pass valve. The electrical cabinet is designed for outdoor installation and… Continue reading ADI115-30-Poland

BVG132/VG75- Latvia

BIOGAS COMPRESSORS / RNG GRID INJECTION BVG132/ VG75 2x BVG 132   LOCATION: LATVIAFLUID: Biogas    POWER INSTALLED: 200 hp (x2)INLET PRESSURE: 4,4 psi(g)WORKING PRESSURE: Up to 116 psi(g)FLOW RATE: 0<374<698 SCFMAMBIENT TEMPERATURE: +37,4/+104 °F VG 75 LOCATION: LATVIAFLUID: Biomethane  POWER INSTALLED: 125 hpINLET PRESSURE: 79,8 psi(g)WORKING PRESSURE: Up to 246,6 psi(g)FLOW RATE: 0<389<779 SCFMAMBIENT TEMPERATURE: +37,4/+104 °F   A complete automatic solution for biogas upgrading and biomethane grid injection consisting… Continue reading BVG132/VG75- Latvia

VG75-France

BIOMETHANE COMPRESSOR VG75 LOCATION: FRANCEFLUID: BiomethanePOWER INSTALLED: 125 HpINLET PRESSURE: 725 psi(g)WORKING PRESSURE: Up to 203 psi(g)FLOW RATE: 0<142<283 SCFMAMBIENT TEMPERATURE: -4/+104 °F Screw compressor for biomethane located in France. Designed for classified Atex Zone 2 for outdoor installation. Water-cooled, completed with temperature control, fine filtration and controlled by PLC. It is equipped with silencers for reducing the noise level to… Continue reading VG75-France

UVG200/UVG110-Italy

BIOGAS COMPRESSORS UVG200/ UVG110 UVG 200   LOCATION: ITALYFLUID: Biogas    POWER INSTALLED: 340 HpINLET PRESSURE: 5,8 psi(g)WORKING PRESSURE: Up to 203 psi(g)FLOW RATE: 0<429<869 SCFMAMBIENT TEMPERATURE: +14/+104 °F UVG 110 LOCATION: ITALYFLUID: Biogas POWER INSTALLED: 220 HpINLET PRESSURE: 5,8 psi(g)WORKING PRESSURE: Up to 203 psi(g)FLOW RATE: 0<237<475 SCFMAMBIENT TEMPERATURE: +14/+104 °F   Two screw biogas compressors for upgrading located in Italy. Designed for classified Atex Zone 2 for outdoor installation,… Continue reading UVG200/UVG110-Italy

ADI115-30-France

BIOMETHANE BOOSTER ADI115-30 LOCATION: FRANCEFLUID: BiomethanePOWER INSTALLED: 50 HpINLET PRESSURE: 174 psi(g)WORKING PRESSURE: Up to 982 psi(g)FLOW RATE: 0<93<187 Nm³/hAMBIENT TEMPERATURE: +14/+104 °F Double-stage reciprocating compressor for biomethane grid injection installed in France. Designed for classified Atex Zone 2 for outdoor installation, controlled by PLC and it is equipped with fully electrical by-pass system.

Contact us

Write us for support or information